Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
After total remodel. The living area roof was raised to accommodate vaulted ceilings. The interior was demolished down to the studs. Walls were moved - larger master bath, 3rd bath added, kitchen and living areas enlarged. Homeowner chose all finishes.